Project Description
This unique park is rich in history, dating back to 1858. Upon excavation we realized an Archeological dig was required. Scope of work included: drainage, installation of meter chamber, piping, lighting, rubber floor surfacing, wood play mulch, 3 various playgrounds, concrete seating walls, curbs, elaborate Iron entryway, benches, sodding and planting of trees and shrubs.